Technical Reports
Up one levelTDAs, SAPs ...
- Volta River Basin - Preliminary(SAP) Strategic Action Programme, Final Report. 2002. (638 KB)
- The present Draft Preliminary Strategic Action Programme is based on the findings of the draft preliminary TDA that represents a regional synthesis of major issues identified from the national reports and regional meetings. The draft preliminary TDA identifies the priorities among land and water-related problems and concerns, their socio-economic root causes, the sectoral implications of actions needed to mitigate them, and the extent to which the problems are transboundary in either origin or effect. (p. iii)
- Volta River Basin - Preliminary(TDA) Transboundary Diagnostic Analysis, Final Report. 2002. (513 KB)
- In summary, this TDA follows the GEF TDA Guidelines for International Waters projects. However, an additional step was achieved, that is, the use of EQOs to facilitate consensus on the desired state of the Volta River Basin after the next pentade or decade. The EQOs naturally led to the identification of specific targets to be met within the desired time frame, which then led to the identification of specific interventions and actions that can be considered in the framework of the NAPs and SAP. (p. 1)
- Volta River Basin - Preliminary(TDA) Transboundary Diagnostic Analysis - Appendices (6.4 MB)
- Zip file contains appendices of Preliminary TDA of Volta River Basin.

Experience Notes
Website Toolkit
Project websites
Workshops
IW Jobs
E-Bulletin