Project Document

Integrated Strategies for the Management of Transboundary Waters on the Eastern European Fringe: Pilot Study of Lake Peipsi and Its Drainage Basin

The aim of the project is to analyze and develop strategic planning methodologies and scientific tools for the integrated water management in transboundary watersheds located on the existing and future borders of the European Union.

Download

PDF

English

30 May 2014