International Waters learning Exchange & Resource Network

Developing the Danube River Basin Pollution Reduction Programme RER/96/G31 :Terminal Evaluation (1999)

The “Developing the Danube River Basin Pollution Reduction Programme” project RER/96/G31 represents the Global Environment Facility (GEF)’s contribution to the second phase of an Environmental Programme for the Danube River Basin (EPDRB), created in 1992. The project’s overall long-term objective was to stimulate sustainable, institutional and financial arrangements for effective environmental management of the Danube River Basin. The immediate goal was to prepare for funding pollution prevention and reduction activities required to both restore the Danube River basin and protect the Black Sea environment.

342: Developing the Danube River Basin Pollution Reduction Programme

27 mai 2014

Developing the Danube River Basin Pollution Reduction Programme RER/96/G31 :Terminal Evaluation (1999).pdf

Danube
Pollution
Terminal Evaluation