The document library includes a wide array of outputs from projects (reports, presentations, case studies, terms of reference) as well as other content of interest to GEF International waters. Project managers and GEF International Waters staff are invited to give their feedback or submit case studies, ToRs, or other documentation to be included in the document library (info@iwlearn.org)
Documents |
---|
Filter: rehabilitation |
13 May 2024
- report
- project: 4953
- English
Forest landscape restoration interventions Mano River Union James McBreen and Nicolas Jewell IUCN Report on the FLR approach and provides guidance on its potential to contribute to integrated water and forest resources management that provides tangible benefits for people, nature, and climate in the Mano River Union. |
29 Aug 2020
- project-document
- project: 4940
- English
[WIOSAP] Upscaling and Amplification of the Msingini Wastewater Treatment Facility Model in Chake Chake Town, Pemba The project seeks to utilise an existing under-performing Constructed Wetland System on Pemba Island and significantly improve its long-term management, efficiency and it’s benefit to the surrounding community of more than 5,500 people, both in te... |
29 Aug 2020
- report
- project: 4940
- English
[WIOSAP] Mangrove Restoration and Livelihood Support Through Community Participation in Mozambique Technical Report The Nairobi Convention Secretariat (NCS) undertook a pre-project visit from 15 to 16 January 2020 to meet with project proponents, partners, and communities to gain first-hand information about the problem that the project intends to address, mech... |
28 Aug 2020
- project-document
- project: 4940
- English
[WIOSAP] Sustainable Management of Shallow Marine Habitats in the Comoros Through Improved Management Planning and Rehabilitation of Degraded Sites The overall objective of this project is to strengthen the management of critical shallow marine habitats in the Comoros. This will be achieved using three min approaches, which will involve: The preparation of site management plans for four forma... |
27 Aug 2020
- newsletter
- project: 4932
- English
[GEF IWEco] IWEco:Link - Volume 3, Issue 2 (April - June 2020) In this issue: SVG: Addressing Land Degradation in the Georgetown Watershed, pgs.1-3; IWEco and post-COVID-19 recovery, pgs.1-8; Winner of IWEco’s “Favourite Tree” Competition, pg.4; The Cordia tree, pg.4; SKN: Progress with works to rehabilitate ... |
22 Apr 2020
- newsletter
- project: 4932
- Spanish
[GEF IWEco] IWEco:Link - Volumen 2, Número 1 (Marzo 2019) En esta edición - Reduciendo y Revirtiendo la Degradación de la Tierra en Sitios Seleccionados de Extracción en el Noreste de Trinidad usando el enfoque de IWEco; IWEco’s Primera Reunión de Asociación de Gobernanza del IWEco exitosamente llevada a... |
22 Apr 2020
- newsletter
- project: 4932
- English
[GEF IWEco] IWEco:Link - Volume 2, Issue 1 (March 2019) In this issue: Reducing and Reversing Land Degradation at Selected Quarry Sites in the North East of Trinidad using an IWEco approach; IWEco’s First Governance Partnership Meeting successfully held!; Quarry Rehabilitation Champions trained; Enviro... |
22 Apr 2020
- newsletter
- project: 4932
- English
[GEF IWEco] IWEco:Link - Volume 3, Issue 1 (January - March 2020) In this issue: Local communities benefit from SGP collaboration with IWEco, pgs. 1-3; Message from the RPC, pgs. 1-8; SGP in St. Kitts & Nevis Highlights, pg. 2; IWEco:TT Quarry Rehabilitation Champions have graduated, pg. 4; Having fun and learni... |
15 May 2015
- report
- project: 767
Plan de Gestion Environnementale pour l'Atténuation des Impacts sur l'Environnement du Projet de la Commission du Bassin du Lac Tchad (CBLC) intitulé Inversion des Tendances de Dégradation des Terres et de l'Eau dans le Bassin du Lac Tchad |
10 Sep 2014
- sap
- project: 1188
Strategic Action Programme: Guinea Current Large Marine Ecosystem This Strategic Action Programme (SAP) for the Guinea Current Large Marine Ecosystem (GCLME) is a negotiated policy document under the aegis of the IGCC (later GCC) which describes policy, legal and institutional reforms and investments needed to ... |
03 Sep 2014
- sap
- project: 1109
Strategic Action Plan for the Management of Priority Environmental Problems in the Senegal River Basin 29 July 2008. Acknowledgements: The Strategic Action Program (SAP) for the management of priority problems in the Senegal River Basin is the result of teamwork with the participation of many individuals and institutions. In addition to the team of... |
03 Sep 2014
- sap
- project: 1109
Plan d’Action Stratégique de Gestion des Problèmes Environnementaux Prioritaires du Bassin du Fleuve Sénégal 29 juillet 2008. Remerciements: Le présent Plan d’Action Stratégique (PAS) de gestion des problèmes environnementaux prioritaires du bassin du fleuve Sénégal est le produit d’un travail d’équipe dans... |
04 Jun 2014
- project-document
- project: 1580
Regional (Bulgaria, Romania, Georgia, Russian Federation, Turkey, Ukraine): Control Of Eutrophication, Hazardous Substances And Related Measures For Rehabilitating Black Sea ecosystem: Project Brief The long-term objective of the project is to assist the beneficiary countries to take measures to reduce nutrient levels and other hazardous substances to such levels necessary to permit Black Sea ecosystems to recover to similar conditions as tho... |
02 Jun 2014
- fact-sheet
- project: 88
Lake Victoria Environmental Management Project: Factsheet The Project aims to conserve and manage the large freshwater body with unique biodiversity and economic importance threatened by pollution, over exploitation of resources, and invasive species. Overall, its goal is to begin a program that will mo... |
30 May 2014
- project-document
- project: 614
Demonstrations of Innovative Approaches to the Rehabilitation of Heavily Contaminated Bays in the Wider Caribbean Demonstrations of Innovative Approaches to the Rehabilitation of Heavily Contaminated Bays in the Wider Caribbean |
27 May 2014
- report
- project: 767
Cadre de Procédure pour l'Atténuation des Impacts Sociaux du Projet de la Commission du Bassin du Lac Tchad (CBLC) intitulé “Inversion des Tendances de Dégradation des Terres et de l'Eau du Bassin du Lac Tchad” Le projet d'“Inversion des Tendances de Dégradation des Terres et de l'Eau du Bassin du Lac Tchad” (le Projet) a été initié par les six pays du Bassin du Lac Tchad (Soudan, Tchad, Niger, Nigéria, Républiqu... |
26 May 2014
- final-summary
- project: 614
Planning and Management of Heavily Contaminated Bays and Coastal Areas in the Wider Caribbean: Final Report (Pilot Phase) Demonstrations of Innovative Approaches to the Rehabilitation of Heavily Contaminated Bays in the Wider Caribbean |
26 May 2014
- project-document
- project: 614
Demonstrations of Innovative Approaches to the Rehabilitation of Heavily Contaminated Bays in the Wider Caribbean:Project Brief (Phase II) Demonstrations of Innovative Approaches to the Rehabilitation of Heavily Contaminated Bays in the Wider Caribbean |
26 May 2014
- report
- project: 397
Strategic Action Plan for the Rehabilitation and Protection of the Black Sea (1996) Under this Strategic Action Plan the Governments of Bulgaria, Georgia, Romania, the Russian Federation, Turkey, and Ukraine reaffirmed their commitment to agree on the principles, policies and actions governing the rehabilitation and protection ... |
26 May 2014
- project-document
- project: 397
GEF Strategic Partnership Danube/Black Sea Basin, Element 1 - Regional Control Of Eutrophication, Hazardous Substances And Related Measures For Rehabilitating The Black Sea Ecosystem (Phase 1 ) (Bulgaria, Romania, Georgia, Russian Federation, T... Black Sea Environment Programme - Project Brief GEF Strategic Partnership Danube/Black Sea Basin, Element 1 - Regional Control Of Eutrophication, Hazardous Substances And Related Measures For Rehabilitating The Black Sea Ecosystem: A Project... |