International Waters learning Exchange & Resource Network

Support for the Extension of Accident Risk Spots Inventory and Preventive Measures

The project, which will be described in the following, is consisting of two major tasks aimed at an: · upgrade of the accidental risk spot (ARS) inventory, which was performed in 2001 by the experts of the ICPDR and · an assessment and prioritisation of old contaminated sites (OCS) in flood risk areas

1460: Strengthening the Implementation Capacities for Nutrient Reduction and Transboundary Cooperation in the Danube River Basin-Phase I Project

06 May 2010

report

Support for the Extension of Accident Risk Spots Inventory and Preventive Measures.pdf

Danube
Report